TPS25910EVM-088

Mfr. #: TPS25910EVM-088
制造商: Texas Instruments
描述: Power Management IC Development Tools Hi-Current Load Switch EVAL MOD
生命周期: 制造商新产品。
数据表: TPS25910EVM-088 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS25910EVM-088 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. 3 V to 20 V Input Voltage Output Voltage is 3 V to 20 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.275039 oz of Unit Weight

TPS25910EVM-088 Image

TPS25910EVM-088

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS25910EVM-088 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS25910
  • Input Voltage: 3 V to 20 V
  • Output Voltage: 3 V to 20 V
  • Description/Function: Evaluation module for the TPS25910
  • Series: TPS25910
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.275039 oz

TPS25910EVM-088

TPS25910EVM-088 Specifications

TPS25910EVM-088 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Load Switches.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3 V to 20 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 3 V to 20 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.275039 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top