| Mfr. #: | TPS2H160EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools TPS2H160EVM |
| 生命周期: | 制造商新产品。 |
| 数据表: | TPS2H160EVM 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Distributions type. 3.4 V to 40 V Input Voltage Output Voltage is 40 V Output current: 2.5 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 150 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2H160EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Power Distributions.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 3.4 V to 40 V
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 40 V
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 2.5 A
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 150 C.
A: Is the cutoff frequency of the product Minimum Operating Temperature?
Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: At what frequency does the Tradename?
Q: The product Tradename is SIMPLE SWITCHER.