TPS53647EVM-710

Mfr. #: TPS53647EVM-710
制造商: Texas Instruments
描述: Power Management IC Development Tools TPS53647EVM-710
生命周期: 制造商新产品。
数据表: TPS53647EVM-710 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS53647EVM-710 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. 8 V to 14 V Input Voltage Output Voltage is 1 V Output current: 120 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 2.454152 oz of Unit Weight

TPS53647EVM-710 Image

TPS53647EVM-710

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS53647EVM-710 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: TPS53647
  • Input Voltage: 8 V to 14 V
  • Output Voltage: 1 V
  • Description/Function: Evaluation module for the TPS53647 controller
  • Output Current: 120 A
  • Series: TPS53647
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 2.454152 oz

TPS53647EVM-710

TPS53647EVM-710 Specifications

TPS53647EVM-710 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Switching Controllers.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 8 V to 14 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1 V

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 120 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 125 C

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 2.454152 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top