TPS54331EVM-232

Mfr. #: TPS54331EVM-232
制造商: Texas Instruments
描述: Power Management IC Development Tools SWIFT Cnvrtr Eval Mod
生命周期: 制造商新产品。
数据表: TPS54331EVM-232 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS54331EVM-232 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. 15 V Input Voltage Output Voltage is 3.3 V Dimensions of 76.2 mm x 76.2 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 5.808034 oz of Unit Weight

TPS54331EVM-232 Image

TPS54331EVM-232

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54331EVM-232 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS54331
  • Input Voltage: 15 V
  • Output Voltage: 3.3 V
  • Dimensions: 76.2 mm x 76.2 mm
  • Series: TPS54331
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 5.808034 oz

TPS54331EVM-232

TPS54331EVM-232 Specifications

TPS54331EVM-232 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 15 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 3.3 V

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 76.2 mm x 76.2 mm.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 5.808034 oz.

23 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top