| Mfr. #: | TPS54810EVM-213 |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools TPS54810 Evaluation Module |
| 生命周期: | 制造商新产品。 |
| 数据表: | TPS54810EVM-213 数据表 |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. 5 V Input Voltage Output Voltage is 1.8 V Dimensions of 76.2 mm x 76.2 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SWIFT is Blue Gecko.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54810EVM-213 Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is Voltage Regulators - Switching Regulators.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 5 V
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 1.8 V.
A: Is the cutoff frequency of the product Dimensions?
Q: Yes, the product's Dimensions is indeed 76.2 mm x 76.2 mm
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: What is the Tradename of the product?
Q: The Tradename of the product is SWIFT.