TPS62060EVM-663

Mfr. #: TPS62060EVM-663
制造商: Texas Instruments
描述: Power Management IC Development Tools TPS62060EVM-663
生命周期: 制造商新产品。
数据表: TPS62060EVM-663 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62060EVM-663 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 2.7 V to 6 V Input Voltage Output Voltage is 1.8 V Output current: 1.6 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.040424 oz of Unit Weight

TPS62060EVM-663 Image

TPS62060EVM-663

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62060EVM-663 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS62060
  • Input Voltage: 2.7 V to 6 V
  • Output Voltage: 1.8 V
  • Description/Function: The TPS62060EVM-663 is a fully assembled and tested platform for evaluating the performance of the TPS62060 1.6-A step-down converter
  • Output Current: 1.6 A
  • Series: TPS62060
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.040424 oz

TPS62060EVM-663

TPS62060EVM-663 Specifications

TPS62060EVM-663 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 2.7 V to 6 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 1.8 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 1.6 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.040424 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top