| Mfr. #: | TPS62090EVM-063 |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools TPS62090EVM-063 Eval Mod |
| 生命周期: | 制造商新产品。 |
| 数据表: | TPS62090EVM-063 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 2.5 V to 6 V Input Voltage Output Voltage is 1.8 V Output current: 3 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.044767 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62090EVM-063 Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is Voltage Regulators - Switching Regulators.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 2.5 V to 6 V
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 1.8 V
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 3 A
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.044767 oz.