| Mfr. #: | TPS65090EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools TPS65090EVM |
| 生命周期: | 制造商新产品。 |
| 数据表: | TPS65090EVM 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Compatible with TPS65090. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.367332 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65090EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Load Switches.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is I2C.
A: At what frequency does the For Use With?
Q: The product For Use With is TPS65090.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.367332 oz.