TPS65131EVM-063

Mfr. #: TPS65131EVM-063
制造商: Texas Instruments
描述: Power Management IC Development Tools TPS65131-063 Eval Mod
生命周期: 制造商新产品。
数据表: TPS65131EVM-063 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65131EVM-063 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Power Management Specialized type. 3.3 V Input Voltage Dimensions of 50.8 mm x 40.6 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS65131EVM-063 Image

TPS65131EVM-063

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65131EVM-063 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Power Management Specialized
  • Tool Is For Evaluation Of: TPS65131
  • Input Voltage: 3.3 V
  • Dimensions: 50.8 mm x 40.6 mm
  • Series: TPS65131
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS65131EVM-063

TPS65131EVM-063 Specifications

TPS65131EVM-063 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Power Management Specialized

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 3.3 V

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 50.8 mm x 40.6 mm

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top