TPS65288EVM

Mfr. #: TPS65288EVM
制造商: Texas Instruments
描述: Power Management IC Development Tools TPS65288 EVAL MOD
生命周期: 制造商新产品。
数据表: TPS65288EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65288EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the PMIC Solutions type. 4.5 V to 18 V Input Voltage Output Voltage is 1.2 V to 3.3 V Output current: 2 A, 3 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS65288. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS65288EVM Image

TPS65288EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65288EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS65288
  • Input Voltage: 4.5 V to 18 V
  • Output Voltage: 1.2 V to 3.3 V
  • Description/Function: Designed to provide access to the features of the TPS65288
  • Output Current: 2 A, 3 A
  • Series: TPS65288
  • Brand: Texas Instruments
  • For Use With: TPS65288
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS65288EVM

TPS65288EVM Specifications

TPS65288EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is PMIC Solutions.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 4.5 V to 18 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 1.2 V to 3.3 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 2 A, 3 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TPS65288

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top