TPS65381EVM

Mfr. #: TPS65381EVM
制造商: Texas Instruments
描述: Power Management IC Development Tools TPS65381 EVAL MOD
生命周期: 制造商新产品。
数据表: TPS65381EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65381EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the PMIC Solutions type. 5.8 V to 36 V Input Voltage Output Voltage is 9.5 V Texas Instruments is a trusted brand for quality electronics Interface Type: SPI The product can operate at a maximum temperature of + 150 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS65381EVM Image

TPS65381EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65381EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS65381-Q1
  • Input Voltage: 5.8 V to 36 V
  • Output Voltage: 9.5 V
  • Description/Function: Evaluation module for multi rail power supply
  • Series: TPS65381
  • Brand: Texas Instruments
  • Interface Type: SPI
  • Maximum Operating Temperature: + 150 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS65381EVM

TPS65381EVM Specifications

TPS65381EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is PMIC Solutions.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 5.8 V to 36 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 9.5 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SPI.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 150 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top