| Mfr. #: | TPS7A85EVM-754 |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools TPS7A85EVM-754 |
| 生命周期: | 制造商新产品。 |
| 数据表: | TPS7A85EVM-754 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 1.1 V to 6.5 V Input Voltage Output Voltage is 0.8 V to 5 V Output current: 4 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS7A85. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7A85EVM-754 Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is LDO Voltage Regulators.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 1.1 V to 6.5 V
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 0.8 V to 5 V
A: What is the Output Current of the product?
Q: The Output Current of the product is 4 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the For Use With of the product?
Q: The For Use With of the product is TPS7A85.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 125 C.
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is - 40 C.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools