TPS7B8250EVM

Mfr. #: TPS7B8250EVM
制造商: Texas Instruments
描述: Power Management IC Development Tools TPS7B8250EVM
生命周期: 制造商新产品。
数据表: TPS7B8250EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS7B8250EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 3 V to 40 V Input Voltage Output Voltage is 5 V Output current: 300 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS7B8250EVM Image

TPS7B8250EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7B8250EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS7B82-Q1
  • Input Voltage: 3 V to 40 V
  • Output Voltage: 5 V
  • Output Current: 300 mA
  • Series: TPS7B82-Q1
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS7B8250EVM

TPS7B8250EVM Specifications

TPS7B8250EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is LDO Voltage Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3 V to 40 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 5 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 300 mA

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

18 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top