TRF3701EVM

Mfr. #: TRF3701EVM
制造商: Texas Instruments
描述: RF Development Tools TRF3701 Eval Mod
生命周期: 制造商新产品。
数据表: TRF3701EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF3701EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Modulators / Demodulators type. Frequency range: 400 MHz to 1.5 GHz 5 V operating supply voltage range Dimensions of 76 mm x 76 mm x 1.575 mm Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory

TRF3701EVM Image

TRF3701EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF3701EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Modulators / Demodulators
  • Tool Is For Evaluation Of: TRF3701
  • Frequency: 400 MHz to 1.5 GHz
  • Operating Supply Voltage: 5 V
  • Description/Function: Quadrature modulator is used for up conversion of signals from the transmit chain DAC to the RF power amplifier device
  • Dimensions: 76 mm x 76 mm x 1.575 mm
  • Brand: Texas Instruments
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TRF3701EVM

TRF3701EVM Specifications

TRF3701EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Modulators / Demodulators.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 400 MHz to 1.5 GHz.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 76 mm x 76 mm x 1.575 mm.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is RF Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top