TRF370417EVM

Mfr. #: TRF370417EVM
制造商: Texas Instruments
描述: RF Development Tools TRF370417 Eval Mod
生命周期: 制造商新产品。
数据表: TRF370417EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF370417EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Modulators / Demodulators type. Frequency range: 50 MHz to 6 GHz 5 V operating supply voltage range Dimensions of 38.1 mm x 38.1 mm x 1.579 mm Texas Instruments is a trusted brand for quality electronics Compatible with TRF370x. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. RF Development Tools product type 1 of 100 Development Tools as subcategory

TRF370417EVM Image

TRF370417EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF370417EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Modulators / Demodulators
  • Tool Is For Evaluation Of: TRF37041
  • Frequency: 50 MHz to 6 GHz
  • Operating Supply Voltage: 5 V
  • Description/Function: Quadrature modulator is used for up conversion of signals from the transmit chain DAC to the RF power amplifier device
  • Dimensions: 38.1 mm x 38.1 mm x 1.579 mm
  • Series: TRF370417
  • Brand: Texas Instruments
  • For Use With: TRF370x
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TRF370417EVM

TRF370417EVM Specifications

TRF370417EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Modulators / Demodulators.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 50 MHz to 6 GHz.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 38.1 mm x 38.1 mm x 1.579 mm

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TRF370x.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed RF Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top