TRF3765EVM-F

Mfr. #: TRF3765EVM-F
制造商: Texas Instruments
描述: Clock & Timer Development Tools TRF3765 Eval Mod
生命周期: 制造商新产品。
数据表: TRF3765EVM-F 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF3765EVM-F Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Frequency Synthesizers type. Frequency range: 300 MHz to 4.8 GHz Texas Instruments is a trusted brand for quality electronics Interface Type: USB The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. 3.3 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory 1. 10.582189 oz of Unit Weight

TRF3765EVM-F Image

TRF3765EVM-F

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF3765EVM-F Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: Frequency Synthesizers
  • Tool Is For Evaluation Of: TRF3765
  • Frequency: 300 MHz to 4.8 GHz
  • Series: TRF3765
  • Brand: Texas Instruments
  • Interface Type: USB
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Operating Supply Current: 190 mA
  • Operating Supply Voltage: 3.3 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 10.582189 oz

TRF3765EVM-F

TRF3765EVM-F Specifications

TRF3765EVM-F FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Frequency Synthesizers

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 300 MHz to 4.8 GHz.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Clock & Timer Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 10.582189 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top