TRF37B32EVM

Mfr. #: TRF37B32EVM
制造商: Texas Instruments
描述: RF Development Tools TRF37B32EVM
生命周期: 制造商新产品。
数据表: TRF37B32EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37B32EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the RF Mixers type. Frequency range: 1.95 GHz 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with TRF37x32. RF Development Tools product type 1 of 100 Development Tools as subcategory

TRF37B32EVM Image

TRF37B32EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37B32EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: RF Mixers
  • Tool Is For Evaluation Of: TRF37x32
  • Frequency: 1.95 GHz
  • Operating Supply Voltage: 3.3 V
  • Series: TRF37A32
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: TRF37x32
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TRF37B32EVM

TRF37B32EVM Specifications

TRF37B32EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed RF Mixers

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 1.95 GHz.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TRF37x32

  • A: At what frequency does the Product Type?

    Q: The product Product Type is RF Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top