TRF37C75EVM

Mfr. #: TRF37C75EVM
制造商: Texas Instruments
描述: RF Development Tools Evaluation Module
生命周期: 制造商新产品。
数据表: TRF37C75EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37C75EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory

TRF37C75EVM Image

TRF37C75EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37C75EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: Y
  • Series: TRF37C75
  • Brand: Texas Instruments
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TRF37C75EVM

TRF37C75EVM Specifications

TRF37C75EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed RF Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top