TS3USB3031EVM

Mfr. #: TS3USB3031EVM
制造商: Texas Instruments
描述: Switch IC Development Tools TS3USB3031 EVAL MOD
生命周期: 制造商新产品。
数据表: TS3USB3031EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TS3USB3031EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Multiplexer / Demultiplexer Switches type. Interface Type: USB Texas Instruments is a trusted brand for quality electronics 3.3 V operating supply voltage range Switch IC Development Tools product type 1 of 100 Development Tools as subcategory

TS3USB3031EVM Image

TS3USB3031EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TS3USB3031EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Switch IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Multiplexer / Demultiplexer Switches
  • Tool Is For Evaluation Of: TS3USB3031
  • Interface Type: USB
  • Series: TS3USB3031
  • Brand: Texas Instruments
  • Operating Supply Voltage: 3.3 V
  • Product Type: Switch IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TS3USB3031EVM

TS3USB3031EVM Specifications

TS3USB3031EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Multiplexer / Demultiplexer Switches.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Switch IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top