TSC2005EVM

Mfr. #: TSC2005EVM
制造商: Texas Instruments
描述: Touch Sensor Development Tools TSC2005 Eval Mod
生命周期: 制造商新产品。
数据表: TSC2005EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2005EVM Overview

This product is manufactured by Texas Instruments. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Touch Sensor Development Tools product type 1 of 100 Development Tools as subcategory

TSC2005EVM Image

TSC2005EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2005EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Touch Sensor Development Tools
  • RoHS: N
  • Tool Is For Evaluation Of: TSC2005
  • Operating Supply Voltage: 3.3 V
  • Brand: Texas Instruments
  • Product Type: Touch Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSC2005EVM

TSC2005EVM Specifications

TSC2005EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Touch Sensor Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top