TSC2020EVM

Mfr. #: TSC2020EVM
制造商: Texas Instruments
描述: Display Development Tools TSC2020 Eval Mod
生命周期: 制造商新产品。
数据表: TSC2020EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2020EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards 1.6 V to 3.6 V operating supply voltage range Interface Type: I2C, USB Texas Instruments is a trusted brand for quality electronics Compatible with USB-MODEVM. Display Development Tools product type 1 of 100 Development Tools as subcategory 1. 2.205 lbs of Unit Weight

TSC2020EVM Image

TSC2020EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2020EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Display Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Tool Is For Evaluation Of: TSC2020
  • Operating Supply Voltage: 1.6 V to 3.6 V
  • Interface Type: I2C, USB
  • Brand: Texas Instruments
  • For Use With: USB-MODEVM
  • Product Type: Display Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 2.205 lbs

TSC2020EVM

TSC2020EVM Specifications

TSC2020EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.6 V to 3.6 V.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, USB

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is USB-MODEVM.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Display Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 2.205 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top