TSC2100EVM

Mfr. #: TSC2100EVM
制造商: Texas Instruments
描述: Touch Sensor Development Tools TSC2100 Eval Mod
生命周期: 制造商新产品。
数据表: TSC2100EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2100EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Resistive Touch Sensor type. 2.7 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Touch Sensor Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.390825 oz of Unit Weight

TSC2100EVM Image

TSC2100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2100EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Touch Sensor Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Resistive Touch Sensor
  • Tool Is For Evaluation Of: TSC2100
  • Operating Supply Voltage: 2.7 V
  • Series: TSC2100
  • Brand: Texas Instruments
  • Product Type: Touch Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.390825 oz

TSC2100EVM

TSC2100EVM Specifications

TSC2100EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Resistive Touch Sensor.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 2.7 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Touch Sensor Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.390825 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top