TSW3065EVM

Mfr. #: TSW3065EVM
制造商: Texas Instruments
描述: Clock & Timer Development Tools TSW3065EVM
生命周期: 制造商新产品。
数据表: TSW3065EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW3065EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Clock Synthesizers type. Frequency range: 300 MHz to 4.8 GHz Texas Instruments is a trusted brand for quality electronics Interface Type: USB 5 V/6 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

TSW3065EVM Image

TSW3065EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW3065EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Clock Synthesizers
  • Tool Is For Evaluation Of: TRF3065
  • Frequency: 300 MHz to 4.8 GHz
  • Description/Function: TRF3765 standalone local oscillator source
  • Series: TSW3065
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Current: 430 mA
  • Operating Supply Voltage: 5 V/6 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSW3065EVM

TSW3065EVM Specifications

TSW3065EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Synthesizers

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 300 MHz to 4.8 GHz.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V/6 V

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Clock & Timer Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top