TSW3070EVM

Mfr. #: TSW3070EVM
制造商: Texas Instruments
描述: Data Conversion IC Development Tools TSW3070 Hi Sp DAC
生命周期: 制造商新产品。
数据表: TSW3070EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW3070EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the DAC type. 2.8 V to 3.8 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SMA, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

TSW3070EVM Image

TSW3070EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW3070EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: DAC
  • Tool Is For Evaluation Of: DAC5682Z, THS3095
  • Operating Supply Voltage: 2.8 V to 3.8 V
  • Series: TSW3070
  • Brand: Texas Instruments
  • Interface Type: SMA, USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSW3070EVM

TSW3070EVM Specifications

TSW3070EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 2.8 V to 3.8 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed SMA, USB

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top