TUSB322EVM

Mfr. #: TUSB322EVM
制造商: Texas Instruments
描述: Interface Development Tools TUSB322EVM
生命周期: 制造商新产品。
数据表: TUSB322EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TUSB322EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB Type-C 1.1 type. Texas Instruments is a trusted brand for quality electronics Compatible with TUSB322. 5.5 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory The product's USB Type-C is Blue Gecko.

TUSB322EVM Image

TUSB322EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TUSB322EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: USB Type-C 1.1
  • Tool Is For Evaluation Of: TUSB322
  • Series: TUSB322
  • Brand: Texas Instruments
  • For Use With: TUSB322
  • Operating Supply Voltage: 5.5 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: USB Type-C

TUSB322EVM

TUSB322EVM Specifications

TUSB322EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed USB Type-C 1.1

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is TUSB322.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5.5 V.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Interface Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Tradename?

    Q: The product Tradename is USB Type-C.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top