| Mfr. #: | TUSB7340EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Interface Development Tools 4-port SuperSpd USB xHCI PCIe Card Ref |
| 生命周期: | 制造商新产品。 |
| 数据表: | TUSB7340EVM 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB type. Dimensions of 4.38 in x 2.57 in Texas Instruments is a trusted brand for quality electronics Interface Type: USB 5 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TUSB7340EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed USB
A: At what frequency does the Dimensions?
Q: The product Dimensions is 4.38 in x 2.57 in.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is USB.
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 5 V
A: At what frequency does the Product Type?
Q: The product Product Type is Interface Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.