UCC25600EVM

Mfr. #: UCC25600EVM
制造商: Texas Instruments
描述: Power Management IC Development Tools UCC25600EVM
生命周期: 制造商新产品。
数据表: UCC25600EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC25600EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the AC/DC Converters type. 390 V Input Voltage Output Voltage is 12 V Dimensions of 1.38 in x 1.33 in Output current: 25 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 45 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

UCC25600EVM Image

UCC25600EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC25600EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: AC/DC Converters
  • Tool Is For Evaluation Of: UCC25600
  • Input Voltage: 390 V
  • Output Voltage: 12 V
  • Description/Function: The UCC25600 evaluation module, EVM (HPA341), is a 300W LLC resonant half-bridge converter, providing a regulated output voltage nominally at 12V at maximum 300W of load power with reinforced isolation of AC-DC off-line application between the primary
  • Dimensions: 1.38 in x 1.33 in
  • Output Current: 25 A
  • Series: UCC25600
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 45 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

UCC25600EVM

UCC25600EVM Specifications

UCC25600EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is AC/DC Converters.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 390 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 12 V.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 1.38 in x 1.33 in.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 25 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 45 C

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top