ADC3443EVM

Mfr. #: ADC3443EVM
制造商: Texas Instruments
描述: EVAL MODULE ADC3443
生命周期: 制造商新产品。
数据表: ADC3443EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3443EVM Overview

Product belongs to the - series. Bulk is the packaging method for this product This product's 80M. Data-Interface: LVDS - Serial 14 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADC3443

ADC3443EVM Image

ADC3443EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3443EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Packaging Bulk
  • Sampling-Rate-Per-Second 80M
  • Data-Interface LVDS - Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 4
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC3443
  • Power-Typ-Conditions 288mW @ 80MSPS

ADC3443EVM

ADC3443EVM Specifications

ADC3443EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 80M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed LVDS - Serial

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 14

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 4.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADC3443.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$438.81
US$438.81
10
US$416.86
US$4 168.65
100
US$394.92
US$39 492.47
500
US$372.98
US$186 492.20
1000
US$351.04
US$351 044.20
Top