ADS4142EVM

Mfr. #: ADS4142EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR ADS4142
生命周期: 制造商新产品。
数据表: ADS4142EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4142EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 65M. Data-Interface: CMOS, LVDS, Serial, Parallel 14 bits 1 units Input range: 2 Vpp Included item: Board. IC package type: ADS4142 This tool is designed for the ADS4142. SPI interface type

ADS4142EVM Image

ADS4142EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4142EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 65M
  • Data-Interface CMOS, LVDS, Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 1
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4142
  • Power-Typ-Conditions -
  • Tool-Is-For-Evaluation-Of ADS4142
  • Interface-Type SPI

ADS4142EVM

ADS4142EVM Specifications

ADS4142EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 65M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is CMOS, LVDS, Serial, Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 14

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS4142

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS4142

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$57.46
US$57.46
10
US$54.59
US$545.92
100
US$51.72
US$5 171.85
500
US$48.85
US$24 422.65
1000
US$45.97
US$45 972.00
Top