| Mfr. #: | ADS41B25EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | EVAL MODULE FOR ADS41B25 |
| 生命周期: | 制造商新产品。 |
| 数据表: | ADS41B25EVM 数据表 |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 125M. Data-Interface: CMOS, LVDS, Serial, Parallel 12 bits 1 units Input range: 1.5 Vpp Included item: Board. IC package type: ADS41B25 This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the ADS41B25. SPI interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS41B25EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: What is the Type of the product?
Q: The Type of the product is ADC.
A: At what frequency does the Sampling-Rate-Per-Second?
Q: The product Sampling-Rate-Per-Second is 125M.
A: What is the Data-Interface of the product?
Q: The Data-Interface of the product is CMOS, LVDS, Serial, Parallel.
A: At what frequency does the Number-of-Bits?
Q: The product Number-of-Bits is 12.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 1.
A: At what frequency does the Input-Range?
Q: The product Input-Range is 1.5 Vpp.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADS41B25.
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 1.8 V 3.3 V.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is ADS41B25.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is SPI.