ADS4226EVM

Mfr. #: ADS4226EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR ADS4226
生命周期: 制造商新产品。
数据表: ADS4226EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4226EVM Overview

Product belongs to the - series. This product's 160M. Data-Interface: CMOS, LVDS, Serial, Parallel 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS4226

ADS4226EVM Image

ADS4226EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4226EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 160M
  • Data-Interface CMOS, LVDS, Serial, Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4226
  • Power-Typ-Conditions -

ADS4226EVM

ADS4226EVM Specifications

ADS4226EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 160M

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is CMOS, LVDS, Serial, Parallel.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS4226.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$346.20
US$346.20
10
US$328.89
US$3 288.90
100
US$311.58
US$31 158.00
500
US$294.27
US$147 135.00
1000
US$276.96
US$276 960.00
Top