ADS5281EVM

Mfr. #: ADS5281EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR ADS5281
生命周期: 制造商新产品。
数据表: ADS5281EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5281EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 50M. Data-Interface: Serial 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS5281 This product operates at a 1.8 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS5281. SMA interface type

ADS5281EVM Image

ADS5281EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5281EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category IC Chips
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 50M
  • Data-Interface Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5281
  • Power-Typ-Conditions 77mW @ 65MSPS
  • Operating-Supply-Voltage 1.8 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS5281
  • Interface-Type SMA

ADS5281EVM

ADS5281EVM Specifications

ADS5281EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 50M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS5281

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS5281.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$57.46
US$57.46
10
US$54.59
US$545.92
100
US$51.72
US$5 171.85
500
US$48.85
US$24 422.65
1000
US$45.97
US$45 972.00
Top