ADS5401EVM

Mfr. #: ADS5401EVM
制造商: Texas Instruments
描述: ADS5401EVM EVALUATION MODULE
生命周期: 制造商新产品。
数据表: ADS5401EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5401EVM Overview

Product belongs to the ADS5401 series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS540x amplifier. This product's 800M. Data-Interface: DDR LVDS 12 bits 1 units Input range: 1 Vpp Included item: Board. IC package type: ADS5401 This product operates at a 5 V supply voltage for reliable performance. This product is an Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS. This tool is designed for the ADS540x. SPI USB interface type

ADS5401EVM Image

ADS5401EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5401EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series ADS5401
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS540x
  • Sampling-Rate-Per-Second 800M
  • Data-Interface DDR LVDS
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5401
  • Power-Typ-Conditions 1.33W @ 800MSPS
  • Operating-Supply-Voltage 5 V
  • Description-Function Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS
  • Tool-Is-For-Evaluation-Of ADS540x
  • Interface-Type SPI USB

ADS5401EVM

ADS5401EVM Specifications

ADS5401EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed ADS5401

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is ADS540x.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 800M

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is DDR LVDS.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 1 Vpp

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS5401.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS540x.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$95.90
US$95.90
10
US$91.10
US$911.00
100
US$86.31
US$8 630.55
500
US$81.51
US$40 755.40
1000
US$76.72
US$76 716.00
Top