ADS5404EVM

Mfr. #: ADS5404EVM
制造商: Texas Instruments
描述: ADS5404EVM EVALUATION MODULE
生命周期: 制造商新产品。
数据表: ADS5404EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5404EVM Overview

Product belongs to the ADS5404 series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS540x ADS54T0x amplifier. This product's 500M. Data-Interface: DDR LVDS 12 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS5404 This product operates at a 5 V supply voltage for reliable performance. This product is an Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS. This tool is designed for the ADS540x ADS54T0x. SPI USB interface type

ADS5404EVM Image

ADS5404EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5404EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series ADS5404
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS540x ADS54T0x
  • Sampling-Rate-Per-Second 500M
  • Data-Interface DDR LVDS
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5404
  • Power-Typ-Conditions 1.84W @ 500MSPS
  • Operating-Supply-Voltage 5 V
  • Description-Function Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS
  • Tool-Is-For-Evaluation-Of ADS540x ADS54T0x
  • Interface-Type SPI USB

ADS5404EVM

ADS5404EVM Specifications

ADS5404EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is ADS5404.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is ADS540x ADS54T0x.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 500M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed DDR LVDS

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 1 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS5404

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS540x ADS54T0x.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$95.90
US$95.90
10
US$91.10
US$911.00
100
US$86.31
US$8 630.55
500
US$81.51
US$40 755.40
1000
US$76.72
US$76 716.00
Top