ADS5409EVM

Mfr. #: ADS5409EVM
制造商: Texas Instruments
描述: MODULE EVAL FOR ADS5409
生命周期: 制造商新产品。
数据表: ADS5409EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5409EVM Overview

Product belongs to the ADS5409 series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS540x amplifier. This product's 900M. Data-Interface: DDR LVDS 12 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS5409 This product operates at a 5 V supply voltage for reliable performance. This product is an ADS5409 - 12 Bit 900M Samples per Second Analog to Digital Converter (ADC) Evaluation Board. This tool is designed for the ADS540x. GUI interface type

ADS5409EVM Image

ADS5409EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5409EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series ADS5409
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS540x
  • Sampling-Rate-Per-Second 900M
  • Data-Interface DDR LVDS
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5409
  • Power-Typ-Conditions 2.27W @ 900MSPS
  • Operating-Supply-Voltage 5 V
  • Description-Function ADS5409 - 12 Bit 900M Samples per Second Analog to Digital Converter (ADC) Evaluation Board
  • Tool-Is-For-Evaluation-Of ADS540x
  • Interface-Type GUI

ADS5409EVM

ADS5409EVM Specifications

ADS5409EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed ADS5409

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed ADS540x

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 900M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed DDR LVDS

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 1 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS5409.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is ADS5409 - 12 Bit 900M Samples per Second Analog to Digital Converter (ADC) Evaluation Board.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS540x

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is GUI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$748.50
US$748.50
10
US$711.08
US$7 110.75
100
US$673.65
US$67 365.00
500
US$636.22
US$318 112.50
1000
US$598.80
US$598 800.00
Top