ADS6245EVM

Mfr. #: ADS6245EVM
制造商: Texas Instruments
描述: ADS6245EVM
生命周期: 制造商新产品。
数据表: ADS6245EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS6245EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 125M. Data-Interface: Serial, Parallel 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS6245 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS6245. SMA interface type

ADS6245EVM Image

ADS6245EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS6245EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 125M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS6245
  • Power-Typ-Conditions 500mW @ 125MSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS6245
  • Interface-Type SMA

ADS6245EVM

ADS6245EVM Specifications

ADS6245EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 125M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial, Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 14

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS6245.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS6245

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$336.02
US$336.02
10
US$319.21
US$3 192.14
100
US$302.41
US$30 241.35
500
US$285.61
US$142 806.40
1000
US$268.81
US$268 812.00
Top