ADS7826EVM

Mfr. #: ADS7826EVM
制造商: Texas Instruments
描述: EVALUATION MODULE FOR ADS7826
生命周期: 制造商新产品。
数据表: ADS7826EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7826EVM Overview

Product belongs to the microPOWER series. This product's 200k. Data-Interface: SPI 10 bits 1 units Input range: 0 ~ VREF Included item: Board. IC package type: ADS7826

ADS7826EVM Image

ADS7826EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7826EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Sampling-Rate-Per-Second 200k
  • Data-Interface SPI
  • Number-of-Bits 10
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7826
  • Power-Typ-Conditions -

ADS7826EVM

ADS7826EVM Specifications

ADS7826EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is microPOWER.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 200k.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is SPI.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 10.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 0 ~ VREF.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS7826

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$0.00
US$0.00
10
US$0.00
US$0.00
100
US$0.00
US$0.00
500
US$0.00
US$0.00
1000
US$0.00
US$0.00
Top