| Mfr. #: | ADS7863EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | EVAL MODULE FOR ADS7863 |
| 生命周期: | 制造商新产品。 |
| 数据表: | ADS7863EVM 数据表 |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 2M. Data-Interface: Serial 12 bits 2 units Input range: ±VREF Included item: Board. IC package type: ADS7863 This product operates at a 2.7 V to 3.6 V supply voltage for reliable performance. This tool is designed for the ADS7863. USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7863EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is ADC.
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 2M.
A: At what frequency does the Data-Interface?
Q: The product Data-Interface is Serial.
A: At what frequency does the Number-of-Bits?
Q: The product Number-of-Bits is 12.
A: At what frequency does the Number-of-A-D-Converters?
Q: The product Number-of-A-D-Converters is 2.
A: At what frequency does the Input-Range?
Q: The product Input-Range is ±VREF.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is ADS7863.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 2.7 V to 3.6 V.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is ADS7863.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is USB.