ADS7866EVM

Mfr. #: ADS7866EVM
制造商: Texas Instruments
描述: MODULE EVAL FOR ADS7866
生命周期: 制造商新产品。
数据表: ADS7866EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7866EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 200k. Data-Interface: Serial 12 bits 1 units Input range: 0 ~ 3.6 V Included item: Board. IC package type: ADS7866 This product operates at a 1.2 V to 3.6 V supply voltage for reliable performance. This tool is designed for the ADS7866.

ADS7866EVM Image

ADS7866EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7866EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 200k
  • Data-Interface Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 3.6 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7866
  • Power-Typ-Conditions 1.39mW @ 200kSPS
  • Operating-Supply-Voltage 1.2 V to 3.6 V
  • Tool-Is-For-Evaluation-Of ADS7866

ADS7866EVM

ADS7866EVM Specifications

ADS7866EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 200k.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Serial

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 0 ~ 3.6 V.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS7866.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.2 V to 3.6 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS7866

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top