ADS7871EVM

Mfr. #: ADS7871EVM
制造商: Texas Instruments
描述: EVALUATION MODULE FOR ADS7871
生命周期: 制造商新产品。
数据表: ADS7871EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7871EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC Bulk is the packaging method for this product This product's 48k. Data-Interface: SPI, DSP 14 bits 1 units Input range: 0 ~ 5 V Included item: Board. IC package type: ADS7871 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS7871.

ADS7871EVM Image

ADS7871EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7871EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 48k
  • Data-Interface SPI, DSP
  • Number-of-Bits 14
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7871
  • Power-Typ-Conditions 8.5mW @ 48kSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS7871

ADS7871EVM

ADS7871EVM Specifications

ADS7871EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 48k.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed SPI, DSP

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 14.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 5 V.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS7871.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS7871.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$9.42
US$9.42
10
US$8.95
US$89.49
100
US$8.48
US$847.80
500
US$8.01
US$4 003.50
1000
US$7.54
US$7 536.00
Top