ADS8323EVM

Mfr. #: ADS8323EVM
制造商: Texas Instruments
描述: EVAL MOD FOR ADS8323
生命周期: 制造商新产品。
数据表: ADS8323EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8323EVM Overview

Product belongs to the microPOWER series. This product is categorized as Evaluation Boards Type: ADC This product's 500k. Data-Interface: Parallel 16 bits 1 units Input range: 0 ~ 5 V Included item: Board. IC package type: ADS8323 This product operates at a 5 V supply voltage for reliable performance. This tool is designed for the ADS8323.

ADS8323EVM Image

ADS8323EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8323EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 500k
  • Data-Interface Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8323
  • Power-Typ-Conditions 85mW @ 500kSPS
  • Operating-Supply-Voltage 5 V
  • Tool-Is-For-Evaluation-Of ADS8323

ADS8323EVM

ADS8323EVM Specifications

ADS8323EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is microPOWER.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 500k.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 5 V.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS8323

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS8323.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$114.63
US$114.63
10
US$108.90
US$1 088.98
100
US$103.17
US$10 316.70
500
US$97.44
US$48 717.75
1000
US$91.70
US$91 704.00
Top