ADS8342EVM

Mfr. #: ADS8342EVM
制造商: Texas Instruments
描述: EVALUATION MODULE FOR ADS8342
生命周期: 制造商新产品。
数据表: ADS8342EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8342EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 250k. Data-Interface: Parallel 16 bits 1 units Input range: ±2.5 V Included item: Board. IC package type: ADS8342 This product operates at a 1.8 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8342. SMA interface type

ADS8342EVM Image

ADS8342EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8342EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 250k
  • Data-Interface Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range ±2.5 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8342
  • Power-Typ-Conditions 200mW @ 250kSPS
  • Operating-Supply-Voltage 1.8 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8342
  • Interface-Type SMA

ADS8342EVM

ADS8342EVM Specifications

ADS8342EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 250k.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is ±2.5 V.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS8342

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS8342.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$114.63
US$114.63
10
US$108.90
US$1 088.98
100
US$103.17
US$10 316.70
500
US$97.44
US$48 717.75
1000
US$91.70
US$91 704.00
Top