ADS8371EVM

Mfr. #: ADS8371EVM
制造商: Texas Instruments
描述: EVALUATION MODULE FOR ADS8371
生命周期: 制造商新产品。
数据表: ADS8371EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8371EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 750k. Data-Interface: Parallel 16 bits 1 units Input range: 0 ~ 4.096 V Included item: Board. IC package type: ADS8371 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8371.

ADS8371EVM Image

ADS8371EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8371EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 750k
  • Data-Interface Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 4.096 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8371
  • Power-Typ-Conditions 130mW @ 750kSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8371

ADS8371EVM

ADS8371EVM Specifications

ADS8371EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 750k.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Parallel

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 16.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 4.096 V.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8371.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS8371.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$114.63
US$114.63
10
US$108.90
US$1 088.98
100
US$103.17
US$10 316.70
500
US$97.44
US$48 717.75
1000
US$91.70
US$91 704.00
Top