ADS8381EVM

Mfr. #: ADS8381EVM
制造商: Texas Instruments
描述: EVALUATION MODULE FOR ADS8381
生命周期: 制造商新产品。
数据表: ADS8381EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8381EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 580k. Data-Interface: Parallel 18 bits 1 units Input range: 0 ~ 4.2 V Included item: Board. IC package type: ADS8381 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8381. SMA interface type

ADS8381EVM Image

ADS8381EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8381EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 580k
  • Data-Interface Parallel
  • Number-of-Bits 18
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 4.2 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8381
  • Power-Typ-Conditions 115mW @ 580kSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8381
  • Interface-Type SMA

ADS8381EVM

ADS8381EVM Specifications

ADS8381EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 580k.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 18.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 4.2 V.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8381.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS8381.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SMA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$114.63
US$114.63
10
US$108.90
US$1 088.98
100
US$103.17
US$10 316.70
500
US$97.44
US$48 717.75
1000
US$91.70
US$91 704.00
Top