ADS8556EVM

Mfr. #: ADS8556EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR ADS8556
生命周期: 制造商新产品。
数据表: ADS8556EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8556EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 450k, 630k. Data-Interface: Serial, Parallel 16 bits 6 units Input range: ±4 x VREF Included item: Board. IC package type: ADS8556 This product operates at a 5 V to 15 V supply voltage for reliable performance. This tool is designed for the ADS8556 ADS8557 ADS8558. SMA interface type

ADS8556EVM Image

ADS8556EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8556EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 450k, 630k
  • Data-Interface Serial, Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 6
  • Input-Range ±4 x VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8556
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 5 V to 15 V
  • Tool-Is-For-Evaluation-Of ADS8556 ADS8557 ADS8558
  • Interface-Type SMA

ADS8556EVM

ADS8556EVM Specifications

ADS8556EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 450k, 630k.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Serial, Parallel

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 6

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is ±4 x VREF.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8556.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V to 15 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS8556 ADS8557 ADS8558.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$148.50
US$148.50
10
US$141.08
US$1 410.75
100
US$133.65
US$13 365.00
500
US$126.22
US$63 112.50
1000
US$118.80
US$118 800.00
Top