AFE4403EVM

Mfr. #: AFE4403EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR AFE4403
生命周期: 制造商新产品。
数据表: AFE4403EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE4403EVM Overview

Product belongs to the AFE4403 series. This product is categorized as Evaluation Modules Type: Ultrasound AFE This product is designed AFE4403 amplifier. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: Medical Pulse Oximeter Applications IC package type: AFE4403 This product operates at a 2 V to 3.6 V supply voltage for reliable performance. This product is an AFE4403 evaluation board for heart rate monitors and low-cost pulse oximeters. This tool is designed for the AFE4403. SPI USB interface type

AFE4403EVM Image

AFE4403EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE4403EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series AFE4403
  • Product Evaluation Modules
  • Type Ultrasound AFE
  • For-Use-With AFE4403
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes Medical Pulse Oximeter Applications
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part AFE4403
  • Operating-Supply-Voltage 2 V to 3.6 V
  • Description-Function AFE4403 evaluation board for heart rate monitors and low-cost pulse oximeters
  • Tool-Is-For-Evaluation-Of AFE4403
  • Interface-Type SPI USB

AFE4403EVM

AFE4403EVM Specifications

AFE4403EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is AFE4403.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Ultrasound AFE.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is AFE4403.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Analog Front End (AFE).

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Medical Pulse Oximeter Applications

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is AFE4403.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2 V to 3.6 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is AFE4403 evaluation board for heart rate monitors and low-cost pulse oximeters.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed AFE4403

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$298.50
US$298.50
10
US$283.58
US$2 835.75
100
US$268.65
US$26 865.00
500
US$253.72
US$126 862.50
1000
US$238.80
US$238 800.00
Top