AFE5851EVM

Mfr. #: AFE5851EVM
制造商: Texas Instruments
描述: EVAL BOARD FOR AFE5851
生命周期: 制造商新产品。
数据表: AFE5851EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5851EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC Bulk is the packaging method for this product The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 16 Channel Variable Gain Amplifier (VGA), 8 Channel LVDS IC package type: AFE5851 This product operates at a 1.8 V to 3.3 V supply voltage for reliable performance. This tool is designed for the AFE5851. SMA USB interface type

AFE5851EVM Image

AFE5851EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5851EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Packaging Bulk
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 16 Channel Variable Gain Amplifier (VGA), 8 Channel LVDS
  • Embedded No
  • Utilized-IC-Part AFE5851
  • Operating-Supply-Voltage 1.8 V to 3.3 V
  • Tool-Is-For-Evaluation-Of AFE5851
  • Interface-Type SMA USB

AFE5851EVM

AFE5851EVM Specifications

AFE5851EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Interface, Analog Front End (AFE).

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 16 Channel Variable Gain Amplifier (VGA), 8 Channel LVDS.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is AFE5851.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V to 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is AFE5851.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$346.20
US$346.20
10
US$328.89
US$3 288.90
100
US$311.58
US$31 158.00
500
US$294.27
US$147 135.00
1000
US$276.96
US$276 960.00
Top