AMC1200EVM

Mfr. #: AMC1200EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR AMC1200
生命周期: 制造商新产品。
数据表: AMC1200EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AMC1200EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Type: Isolation Amplifiers Operational temperature range: -40°C ~ 105°C Output-Type: Differential Voltage supply range: 2.7 V ~ 5.5 V The 100kHz The -. Current-Output-Channel is 20mA The amplifier is of Isolation type. Included item: Board. IC package type: AMC1200 Board type: Fully Populated. The product has 1 - Single channel per IC. This product operates at a 4.5 V to 5.5 V supply voltage for reliable performance. This product is an Evaluation Module. This tool is designed for the AMC1200. 2-Wire interface type

AMC1200EVM Image

AMC1200EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AMC1200EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Kits
  • Type Isolation Amplifiers
  • Operating-Temperature -40°C ~ 105°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 2.7 V ~ 5.5 V
  • -3db-Bandwidth 100kHz
  • Slew-Rate -
  • Current-Output-Channel 20mA
  • Amplifier-Type Isolation
  • Supplied-Contents Board
  • Utilized-IC-Part AMC1200
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 5.4mA
  • Operating-Supply-Voltage 4.5 V to 5.5 V
  • Description-Function Evaluation Module
  • Tool-Is-For-Evaluation-Of AMC1200
  • Interface-Type 2-Wire

AMC1200EVM

AMC1200EVM Specifications

AMC1200EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Isolation Amplifiers

  • A: What is the Operating-Temperature of the product?

    Q: The Operating-Temperature of the product is -40°C ~ 105°C.

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is Differential.

  • A: What is the Voltage-Supply-Single-Dual of the product?

    Q: The Voltage-Supply-Single-Dual of the product is 2.7 V ~ 5.5 V.

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 100kHz.

  • A: Is the cutoff frequency of the product Slew-Rate?

    Q: Yes, the product's Slew-Rate is indeed -

  • A: Is the cutoff frequency of the product Current-Output-Channel?

    Q: Yes, the product's Current-Output-Channel is indeed 20mA

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Isolation.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is AMC1200.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: Is the cutoff frequency of the product Channels-per-IC?

    Q: Yes, the product's Channels-per-IC is indeed 1 - Single

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 4.5 V to 5.5 V

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Evaluation Module

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is AMC1200.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is 2-Wire.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top