CDC7005-EVM

Mfr. #: CDC7005-EVM
制造商: Texas Instruments
描述: EVAL BOARD FOR CDC7005 SERIES
生命周期: 制造商新产品。
数据表: CDC7005-EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDC7005-EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Clock Synchronizers This product's 800 MHz range is 0Hz to 2.2GHz. The Timing, Clock Synchronizer is the Main-Purpose. Primary-Attributes: - IC package type: CDC7005 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the CDC7005. SPI interface type

CDC7005-EVM Image

CDC7005-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDC7005-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Clock Synchronizers
  • Frequency 800 MHz
  • Main-Purpose Timing, Clock Synchronizer
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part CDC7005
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of CDC7005
  • Interface-Type SPI

CDC7005-EVM

CDC7005-EVM Specifications

CDC7005-EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Clock Synchronizers.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 800 MHz.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Synchronizer.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed CDC7005

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is CDC7005.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$230.43
US$230.43
10
US$218.91
US$2 189.08
100
US$207.39
US$20 738.70
500
US$195.87
US$97 932.75
1000
US$184.34
US$184 344.00
Top