CDCE18005EVM

Mfr. #: CDCE18005EVM
制造商: Texas Instruments
描述: EVALUATION MODULE FOR CDCE18005
生命周期: 制造商新产品。
数据表: CDCE18005EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCE18005EVM Overview

Product belongs to the - series. The Timing, Clock Buffer / Driver / Receiver / Translator is the Main-Purpose. Primary-Attributes: 3 Inputs, 10 Outputs IC package type: CDCE18005 This tool is designed for the CDCE18005.

CDCE18005EVM Image

CDCE18005EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCE18005EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Timing, Clock Buffer / Driver / Receiver / Translator
  • Primary-Attributes 3 Inputs, 10 Outputs
  • Embedded No
  • Utilized-IC-Part CDCE18005
  • Tool-Is-For-Evaluation-Of CDCE18005

CDCE18005EVM

CDCE18005EVM Specifications

CDCE18005EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Buffer / Driver / Receiver / Translator.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 3 Inputs, 10 Outputs.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDCE18005.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is CDCE18005.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$230.43
US$230.43
10
US$218.91
US$2 189.08
100
US$207.39
US$20 738.70
500
US$195.87
US$97 932.75
1000
US$184.34
US$184 344.00
Top